Upload the tender pack
Contract documents, specifications, drawings and revisions go into one checked document register.
AI tender review for contractors and subcontractors
Upload the contract documents, specification and drawings. Receive a quantified bill of quantities, pre-tender queries and clarifications for your commercial team to review.
Built to reduce tender review time.
Your construction professional keeps the final say.
01 / How it works
BuildOrgs AI reads the same package your estimating team receives and prepares the commercial pack in the format you agree.
Contract documents, specifications, drawings and revisions go into one checked document register.
Scope, quantities, drawing changes and missing information are traced back to their source.
A quantified BoQ, pre-tender query schedule and clarification list, ready for professional sign-off.
What comes back
02 / Estimate the opportunity
Use one number for a quick, high-level estimate of the commercial capacity that more efficient tender review could release.
Plan level and fee confirmed after the demonstration.
Illustrative scenarios, not audited industry averages or guaranteed savings. The 5% option is a high scenario. Replace every assumption with your measured tender data during the pilot.
03 / The review standard
Consistency comes from a fixed review process, not from asking AI to improvise.
Every file and revision is registered before measurement starts.
Each quantity, scope item and query links back to the document that supports it.
Missing drawings, revisions and package boundaries block the pack instead of becoming guesses.
Material quantities are recomputed and a separate reviewer checks the pack.
Your named construction professional signs off the result before it is used.
04 / After the tender
Once the work is secured, load the baseline contract information. Use the same record to review drawing changes, prepare contract queries and support change control while your QS focuses on the live works and subcontract accounts.
05 / In practice
Procurement packs for a £22m project in Farringdon, prepared with a commercial team reviewing the output.
Hiring an AI Procurement Org saved me months working on producing procurement packs for a £22m project in Farringdon.Customer-reported experience. Results depend on the project, scope and review requirements.
Start with one historic tender
Agree the documents, output format and review standard before any work starts. Download the pilot brief.